Slide

Engineering solutions and shop drawings

Our company is able to guide you a fancy version of information displayed in the construction documents. It is drawn to explain the fabrication and installation of the items to the manufacturer’s production crew. Show drawings facilitate engineer’s approval of the product. Read More
Slide

Technical supervision and quality control

Our time is always avaiable and ready to solve any kind of problems during installation and find an immadiate solution. We are a qualified group with suitable knowledge to solve problems related to hydraulic and strucutral mechanical problems. Read More
Slide

Supply of all the special parts

Besides the design of the machines the company is also involved in organize the entire supply and delivery of each components. Our purchasing department arrange the organization’s of many products like hydraulic power pack, hydraulic cylinders etc. Read More

About us and our priorities

Today we are in position to guarantee to our costumers the best possible solution in the choice of the type of equipment and this especially in connection to the specific client’s requirements.

Construction

Equipment

Maintanance

Energy repair

Good Planning

Efficiency

Design

Functional

Awesome Stuff

10+ workers

Quality

Supervision

Who we are

CAD 2000 MLS International consits in a solid team of engineers with more than 40 YEARS of experience in consulting, projecting and supply of equipment for the construcion.

Ask to us for any project to do: road, railways or sewerage tunnels, road or railways bridges, any kind of big precast element. Our Engineers have the solutions for your needs.

  • Il nuovo cantiere

    Construction Magazine

    CAD 2000 is a reality with small dimensions, capable of compete globally with leading specialized companies Special purpose equipment and shuttering a high technological content, able to respond in real time to requirements of potential customers in terms of technology and timeliness, as well as inexpensiveness and service.

  • SMART

    Construction Magazine

    “In our efforts to become a one stop steel centre for tunneling works, we supplied tunnel formwork designed by Eng. Guido Malagutti of CAD 2000 MLS International to Gamuda for the Penchala tunnel on the Sprint Highway.
    “This has been a tough assignment”, said Guido Malagutti, Director of CAD 2000 MLS Internationa “Space is limited underneath the lower deck and the form supports must not only straddle the 500mm slurry pipelines and the other service lines, and their couplings, they must take into account any deviation of the tunnel drive, the tight 250m radius alignment curves, and the road camber of the decks.