POWER TUNNEL 2300 RADIUS – ARGENTINA

For some time , especially in the past years we have been dedicated to the design of tunnel segment.

This shield serves as a temporary support structure for the tunnel while it is being excavated and is divided the workface into overlapping portions that each worker could excavate.

  • Date: 1997
  • Location: Argentina
  • Category: Tunnel segment
  • Investor:

Carousel segment formwork.

engineering & techincal supervision.